SHORT LIST
APPARENT SELECTION
SELECTION
JULY 9, 2024 ADVERTISEMENT


Contract No. 4400029384
State Project No. H.010753.5
FAP No. H010753
US 90/ I-310 Interchange
St. Charles Parish

The following short list has been prepared by the Project Evaluation Team. The names of the Firms are given in order of ranking:

1. Crescent Engineering & Mapping, LLC
sub: APS Engineering and Testing, LLC
sub: Neel-Schaffer, Inc.

2. Gresham Smith
sub: Adaptive Management and Engineering, LLC
sub: Forte and Tablada, Inc.

3. T. Baker Smith, LLC
sub: APS Engineering and Testing, LLC
sub: Intelligent Transportation Systems LLC
sub: WSP USA Inc.

44-29384 US 90 I-310 Interchange PET Evaluation.pdf

Consultants have 72 hours from time of this posting to protest the Short list.

The following Consultant Firm is the apparent selection of the Secretary of DOTD.



Selection:

1. Crescent Engineering & Mapping, LLC
sub: APS Engineering and Testing, LLC
sub: Neel-Schaffer, Inc.