January 28, 2005
ADDENDUM NO. 1

Addendum No. 1
Addendum No. 2
NOTICE TO DOTD CONSULTANT NOTIFICATION LIST:

STATE PROJECT NO. 700-99-0318
FEDERAL AID PROJECT NO. ITS-9903(509)
STATEWIDE INTELLIGENT TRANSPORTATION SYSTEMS (ITS)
DESIGN AND IMPLEMENTATION
STATEWIDE



The ITEMS PROVIDED BY DOTD and REFERENCES as indicated in the Advertisement for the captioned project is hereby deleted and modified to read:
ITEMS PROVIDED BY THE DOTD

1. Regional Implementation Plan
2. Aerial Basemaps
3. As-Built Drawings (if applicable)
REFERENCES

All designs and engineering documents will meet the standard requirements as to format and content of the DOTD; and will be prepared in accordance with the latest applicable editions, supplements and revisions of the following:

1. AASHTO Standards, ASTM Standards or DOTD Test Procedures
2. DOTD Location and Survey Manual
3. DOTD Roadway Design Procedures and Details
4. DOTD Hydraulics Manual
5. DOTD Standard Specifications for Roads and Bridges
6. Manual of Uniform Traffic Control Devices (Millennium Edition)
7. DOTD Traffic Signal Design Manual
8. National Environmental Policy Act (NEPA)
9. National Electric Safety Code
10. DOTD Environmental Impact Procedures (Vols. I-III)
11. Policy on Geometric Design of Highways and Streets
12. Construction Contract Administration Manual
13. Materials Sampling Manual
14. DOTD Bridge Design Manual
15. Consultant Contract Services Manual
16. Geotechnical Engineering Services Document
17. Bridge Inspectors Training Manual/90
18. Federal ITS Standards Program
19. NTCIP Standards

The closing date for the submittal of SF 24-102 for State Project No. 700-99-0318 has not changed and must be submitted prior to 2:00 P.M. on Monday, February 7, 2005.



Mark Chenevert, P.E. .
Contract Services Administrator