2) The required width of the Digital Terrain Model (DTM) will be 300’along the length of the project survey line. Limits of DTM on each side of project centerline may vary.
3) Cross roads will be surveyed for a distance of approximately 300’ and the DTM will be 200’ (100’ left and 100’ right).
4) Major intersections will be surveyed for a distance of approximately 500’ and the DTM will be 200’ (100’ left and 100’ right).
5) Existing drainage map of the project area is required.
Slope Stability Analysis Special Investigations (bedding, foundations, MSE walls, etc.) Settlement Studies including Wick Drains Deep Borings Design Pile Lengths Soil Investigation for Erosion Control
Geotechnical Services Perform all geotechnical services required by Section 804 of the Standard Specifications Review and approve Contractors Pile Driving System Review and approve Contractors Pile Driving Equipment where Wave Equation Analysis is Specified Perform Test Pile Analysis and Recommend Permanent Pile Lengths Perform Cone Penetrometer Test (CPT) when Required Perform Dynamic Monitoring, when required Plan Changes Review, investigate and develop solutions for issues requiring Plan Changes Prepare plan changes as required to correct plan discrepancies including justification, drawings and cost Review and make recommendations for requested changes Note: Services performed for plan changes due to plan error will be performed at no additional fee. Shop Drawings Review Shop Drawings.